Vietnam coconut bran wastewater treatment equipment project

A coconut coir processing enterprise in Vietnam required a wastewater treatment system to address production effluent containing high concentrations of organic matter and fiber impurities, ensuring compliance with discharge standards.
Guinea office building provides 26 sets of direct drinking water equipment

A large office park in Guinea plans to introduce an efficient and reliable direct drinking water system to address the daily drinking water safety issues of employees. Meet the daily drinking water needs of approximately 10000 employees in the park.
Integrated Water Solutions in Guinea

Client: Guinea
Treatment Capacity: 4 Ton/Hour RO Potable Water System
20 Ton/Hour Domestic Sewage Treatment Facility
We successfully delivered a dual-purpose water solution addressing critical water challenges in Guinea, West Africa, comprising
Saudi Arabia Agricultural Planting Water Treatment Project

Client: Saudi Arab
Treatment Capacity: 30 m³/ Hour
Technologies Employed: Quartz sand filter, activated carbon filter, precision filter reverse osmosis system, etc.
Nigeria Power Plant Boiler Ultra Pure Water Project

Client: Nigeria
Treatment Capacity: 30 m³/ Hour
Technologies Employed: Conventional filtration, primary reverse osmosis, secondary reverse osmosis, EDI electrodialysis ion exchange, etc.
Guinea Water Plant Reverse Osmosis Equipment Project

Client: Guinea
Treatment Capacity: 10 m3/ hour
Technologies Employed: Quartz sand filter, activated carbon filter, precision filter, reverse osmosis host, filling line, etc.
Kyrgyzstan Water Plant Project

Client: Kyrgyzstan
Treatment Capacity: 3000 bottles/hour
Technologies Employed: Conventional filtration, reverse osmosis equipment, bottled water filling machines, labeling machines, labeling machines, laser coding machines, etc
South Korean Flower Planting Ultrafiltration Water Treatment Project

Client: South Korea
Treatment Capacity: 4x 60 m3/ Hour
Technologies Employed: Quartz sand filter, activated carbon filter, precision filter, ultrafiltration system, etc.
Uganda Rubber Line New Material Water Treatment Project

Client: Uganda Area Africa
Treatment Capacity: 30 m3/ Hour
Technologies Employed: Conventional filtration, primary reverse osmosis, secondary reverse osmosis, EDI electrodialysis ion exchange, etc.